Proposed 10-year Marinview Outdoor/Trail Improvement Plan
($s used below are rough estimates NOT actual costs)
October 11, 2022
Immediate Projects
1 Install stairs at the end of the Via Recodo Trail – $1,500
2 Clean up area below the Tot Lot – $500
3 Clean up School Meadow – $1,000
4 Build/install trail signage for in-neighborhood trailheads (8 signs/$300) – $2,400 Total – $5,400
Mid-term Projects – Improve “Walkability” of Existing Trails
5 Improve Lower Durant Meadow Trail (leading to the existing bench) – $1,000
6 Improve Elam Trail – $3,000
7 Improve Countyview Valley Trail – $3,000 Total – $7,000
Longer Term Projects – Building/Installing
Trails
8 Build Viewpark Border Trail – $3,000
9 Build Deertrail-Richardson Connector Trail – $2,000
10 Build trail from Lower Durant Meadow Tail to Countyview Valley Trail – $3,000
11 Build trail from Lower Durant Meadow to Carrera Drive – $1,000
12 Build Deertrail Connector Trail
- Redraw parcel lines – $3,000
- Build bridge – $6,000
- Build trail – $2,000
13 Build Countyview Connector Trail
- Install stairs – $2,000
- Build Connector trail to Countyview Valley Trial – $2,000
Benches
Two benches w/o stairs ($4,000/piece), Two benches w/stairs ($5,000/piece) Total – $42,000
Other
Create social gathering space on Viewpark Island – $2,000 Total Cost over 10 years – $56,400