MarinView 10-year Outdoor/Trail Improvement Plan

Prepared by
MarinView Community Association
Paths Committee
Bernard Catalinotto
Beth Waldman Keenan
Jim Burns

Proposed 10-year Marinview Outdoor/Trail Improvement Plan

($s used below are rough estimates NOT actual costs)

October 11, 2022

Immediate Projects

1  Install stairs at the end of the Via Recodo Trail – $1,500

2  Clean up area below the Tot Lot – $500

3  Clean up School Meadow – $1,000

4  Build/install trail signage for in-neighborhood trailheads (8 signs/$300) – $2,400            Total – $5,400

Mid-term Projects – Improve “Walkability” of Existing Trails

5  Improve Lower Durant Meadow Trail (leading to the existing bench) – $1,000

6  Improve Elam Trail – $3,000

7  Improve Countyview Valley Trail – $3,000                                                                             Total – $7,000

Longer Term Projects – Building/Installing

Trails

8  Build Viewpark Border Trail – $3,000

9  Build Deertrail-Richardson Connector Trail – $2,000

10  Build trail from Lower Durant Meadow Tail to Countyview Valley Trail – $3,000

11  Build trail from Lower Durant Meadow to Carrera Drive – $1,000

12  Build Deertrail Connector Trail

  • Redraw parcel lines – $3,000
  • Build bridge – $6,000
  • Build trail – $2,000

13  Build Countyview Connector Trail

  • Install stairs – $2,000
  • Build Connector trail to Countyview Valley Trial – $2,000

Benches

          Two benches w/o stairs ($4,000/piece), Two benches w/stairs ($5,000/piece)              Total – $42,000

Other

       Create social gathering space on Viewpark Island – $2,000             Total Cost over 10 years – $56,400

Previous Marinview Master Trails Plan – 2011

Master Plan – Summary
Master Plan – Background
Master Plan – Path Descriptions
Master Plan – Path Surveys
Master Plan Alternatives & Conclusions:  TBD